WHITE PAPER - Cracking the 'WIP Effect' for Maximum Material Performance
By MICHAEL FORD AND BRUCE ISBELL, VALOR DIVISION OF MENTOR GRAPHICS
Jan 15, 2012
Contact Info
Thanks for submitting your info, your download should begin shortly.
Close Window
x
The number one cause of down-time on SMT lines is related to material, as either a shortage or a logistical misstep that fails to place the right quantity of the right material at the right location at the right time.
From a business perspective, the downtime caused by material problems is often the largest unplanned cost in the manufacturing operation. This paper will review many factors that contribute to the fundamental issue behind the chaos of material related downtime: inventory inaccuracy, and the steps needed to resolve this crucial problem.
Download White Paper Here
|