Gintech plans aggressive solar cell expansion on sufficient material supply
Jan 07, 2008
Backed by sufficient polysilicon supply from long-term contracts, Gintech Energy detailed its aggressive solar cell expansion plan during a recent event held by the Taiwan Stock Exchange (TSE).
Gintech company general manager Guo-Rong (Ellick) Liao highlighted that material sufficiency in 2008 and 2009 is 91% and 102%, respectively. The company plans to house a total capacity of 660 peak megawatt (MWp) at its Guanyin and Hsinchu, Taiwan production facilities in 2008. The capacity is set to rise to 860MWp in 2009 when the company secures land for its third production site, Liao detailed.
Read more - http://www.digitimes.com/bits_chips/a20080107PD210.html
|